Showing posts with label orchid mitts. Show all posts
Showing posts with label orchid mitts. Show all posts

Monday, March 9, 2009

Old Business and New Business

Old Business

IMG_4503

Ta da, the finished mitts. Blocking did not entirely solve the ladder stitch issue, unfortunately.

IMG_4504-1

You can see here what I was talking about before regarding the point on the top "orchid." On the right mitt, the top border lines up to complete the orchid below it:

IMG_4503-1

This is the original photo of the mitt that was lost. This was the (original) left mitt.

IMG_4064-1

You can see that the point didn't line up. When I redid this mitt (grr), I moved the pattern over so that the point did line up correctly. I don't think I would have frogged the previous one, but it did really bug me so I'm glad I fixed it. I'm really not convinced I didn't make a mistake because KnitSpot patterns are usually pretty meticulous and it seems like an odd blip. I really think I missed an instruction.

Speaking of comparison shots...here's the reason I decided to restart my sweater.

IMG_4525-1

Original back on the top, new back on the bottom. See the difference? The original was HUGE.

Here's the pics of my Spunky Eclectic fiber.

IMG_4518

IMG_4524

And here's some of my Spinderella spinning:

IMG_4515-1

Didn't even put a dent in the bag. A pound is, apparently, a lot of fiber. I'm definitely well-supplied for a while with the extra fiber she threw in.

IMG_4517-1

Next up, spinning class spinning:

IMG_4519

New Business

This weekend, I finished the first Caribbean Sock:

IMG_4538-1

IMG_4540-1

And I got to the stopping point on the back of my sweater, so I started on the sleeves. I'm working both at once to make sure the length is consistent. No photo, because it looks just like the back.

Today was my last spinning class (postponed from last week, where we got snowed out) and I learned how to Navajo ply, among other things. It wasn't nearly as hard as I expected it to be and I was so tickled! I asked for help on drafting and got some good tips, plus I got to spin with a bunch of different fibers - flax, a finn/lincoln cross, a mohair/wool blend, something called EcoSpun made out of recycled soda bottles. It was a lot of fun and I'm so pleased with all the progress I've made in the past few weeks.

Tuesday, February 17, 2009

Round and round

I didn't knit most of the time that I was sick, just because all I wanted to do was sleep. I finally picked up some knitting Friday night, but I found that sitting up to knit made me kind of dizzy. I eventually found a compromise pose somewhere between sitting up and lying down that made the vertigo bearable, and I knit. I picked out the part of the Orchid Mitt I had messed up (again) and was able to finish the whole mitt (I may have knit the thumb on Saturday, I'm not sure). With this encouragement, I was also able to motor through the second mitt, and last night I finished it up. They're finally done and I don't have to worry about them anymore.

Overall happiness with the project...meh. I should have used a different yarn, one with a little more bounce. I have HUUUGE ladder stitches down the sides, which is a problem I really haven't had before. I'm not sure what the problem was. I'm hoping that in the soaking and blocking that maybe things will even out a little bit, but I can't block these much because there isn't much give in them to begin with, and I don't want to stretch them out huge. I hope they fit the recipient.

And, just like that, I'm down to three WIPS. I definitely had some startitis going on at the beginning of this year, but I've managed to finish all of those things off and so now I'm down to 1 pair of socks, 1 lace shawl (that has languished for months, but we'll ignore that for now), and the hemlock blanket on my active project list. (I do have a few more wips that are 'hibernating' but those really don't bother me the way active projects do).

Three projects feels very reasonable to me, so I no longer have this "I have got to finish some of these off before I start something else" feeling. I hope to get going on my phyllo sweater tonight.

I'm going to attempt to go on a yarn diet until MD Sheep and Wool; between Christmas and my other recent purchases I have really got more than enough yarn to keep me going for a while and I really need to put the breaks on the money output. I did make one more big expenditure this month, and that was on a spinning class being offered by Nature's Yarns. It turns out...I am the only student! Yesterday was my first class and I learned several things I had not gotten out of the book, so I am looking forward to next week. I have spinning homework to do before then, so that's also on the agenda for tonight. Teach gave me several different preps to try spinning, and I am to try each of these and also to fill two bobbins before class next week so that we can cover plying.

I also had the chance to talk to her about staining my wheel, and she pretty much said there is nothing special I need to know, just to go for it, so I'm going to have to set aside a weekend for that. I still have hopes of getting a certain someone to paint something pretty on the flywheel, maybe in exchange for some of my, ahem, highly textured handspun.

We discussed whether I needed to take the wheel apart to stain it and Teach thought I could do it without taking it apart, there would just be some areas I wouldn't be able to get to as easily, but those parts would be largely covered by the wheel anyway. This is a relief, as I had so much trouble getting the wheel onto the thing that taking it off was kind of a terrifying prospect.

So, plans plans - spin my homework, start my sweater, finish Moonlight Sonata so that I can start Swan Lake, now that I have both yarn and beads in hand. I don't think I want to have both on the needles at once; I try not to have more than one of the same type of project going at the same time. I like to have multiple projects that are suitable for different types of knitting time. I have the hemlock ring for TV knitting, the sock for travel knitting, moonlight sonata for times when I can focus, and the sweater is several different kinds of knitting depending on where in the process I am, so I can move it around as needed. I really think that after all the lace knitting I have done and all the scarf knitting I have been doing...the sweater will move kind of fast.

Sunday, February 1, 2009

In which I have issues

Issue 1: Noro Scarf

My noro scarf is finished.

But, I had issues with my cast on edge. It was floopy and flared and I hated it. If I had taken a picture, you would have hated it too. I decided while I knitted that when I finished I would go back, snip the cast on, unravel the beginning a bit, and then cast off on that end too, since generally speaking my cast offs are much nicer looking than my cast on. (Something about that doesn't sound right, but moving on.)

Well, it turns out that you can't unravel 1x1 rib from that end. It doesn't work. I got out my scissors and cut across the entire cast on row and ended up having to pick all the bits out because there is no unraveling. This was definitely an issue. I pondered what to do about it, and then remembered that I had been on the Yarn Harlot's blog fussing around in the archives because I was bored, and I had read an entry about a crochet cast off. This seemed a promising solution. I was worried that it would be too tight, but it turns out, it was perfect.

IMG_4458-1

I liked it so much that I picked out my original cast-off and did the same on the other end. I photographed it, but it looks exactly the same, so...just picture the above in different colors. Brilliant. I've never had scarf ends look this good. I'm pleased.

Issues resolved. Scarf complete.

IMG_4462

I have to say, I don't like it as much as I thought I would. I mean, it's okay, I don't dislike it, but it's not the best scarf in the history of scarves, period. Also, I have a few million ends to weave in. Several knots and a couple places where the yarn came apart. I got impatient towards the end and just knitted past a couple of knots, but they show and I really should have done it right. But, at least I don't have to weave in those ends. Whatever, I'll weave the ends in during tv time or something.

Issue 2: Tilli Thomas Bag

See previous post re the sillyness of expecting a silky ribbon yarn to hold its shape when wound into a center-pull ball. I got the yarns untangled and rewound, and now the bag is done!

IMG_4452

It only took one skein of each yarn after all. I really thought I was going to need more, but nope...one skein knit 1 crochet 2 Souffle, one skein Berocco Glace (I which I believe has been discontinued), with both yarns held together. It doesn't really show in the picture, but I put in three rows of staggered yarn overs in hopes of letting a little more of the red of the bag peak through. In hindsight, I think I would have knitted this at looser gauge, but I think it's really cute as it is.

Issue 3: Caribbean Sock


This sock was great. I love the colorway, the pattern was easy, I managed to cable sock yarn without a cable needle without too much trouble. I was a little concerned about that, because I knit so tightly that my stitches pop down a few rows as soon as I take them off the needle, but it wasn't too big of an issue.

IMG_4467

See? Isn't it pretty? Doesn't it look so innocent? I just went happily along, until I decided to try it on and see what kind of length I needed to put on it and then...then I found the issue.

IMG_4475-2

I can't get it any further than that. It's stuck. I'll never be able to get it over my heel. The ribbing's okay, but the cabled stitches don't want to stretch. I got out my needle gauge and used the ruler edge to check my gauge. 10 stitches to the inch - 2 more than the pattern-specified gauge. I'm going to rip it back to the ribbing and reknit on larger needles. However, I also have issues with this plan, because I don't have a pair of number 2 needles free and my 3's are also engaged with the Orchid Mitts.

Issue 4: Cards for savings bonds


My boss gives his grandkids savings bonds for their birthdays, and he often asks me to make cards for them, since his preferred approach of sticking them into a plain white envelope has not been well received in the past. I made these two cards this week:

IMG_4453

IMG_4456

Not bad, eh? So what's the issue?

The issue is that he wanted me to make one for Kennedy, not Paige. -_- So, um...I'll be making another card before this Friday. Two, actually. Then all four grandkids are finished and I don't have to worry about it again for a while.

Issue 4: Orchid Mitts


Click the orchid mitts tag to hear the whole saga of issues. Left on a plane, messed up the thumb gusset, etc etc blah blah. So, this is more of an issue resolution than anything else. I photographed, but it wasn't interesting, so we'll revisit when I finish the rest of the mitt.

Friday, January 23, 2009

In which my perfectionism is justified

So, I finally had the intestinal fortitude to face the orchid mitts. The nearly completed mitt is still MIA and I am almost certain I dropped it on the plane. I try not to think about this bit of stupidity because it burns.

I frogged back, carefully and keeping an eye on the number of stitches, on the other mitt, and I finally found the problem all the way at the base of the thumb gussets. I was supposed to yarn over once, then knit three plain rounds and yarn over, knit one, yarn over. I skipped that first single yarn over, and that's why I was short a stitch. The stitch that would have been created by that single yarn over didn't exist because I skipped it, and so I ended up taking one of the other stitches.

When I discovered the error many rows later, I was tempted just to increase and move on, but it killed me that I couldn't figure out where I lost the stitch. I should have been able to see where I dropped a stitch or had an extra decrease. Because I couldn't find it, I wasn't happy just increasing, and so, I frogged.

Even I thought it was stupid to rip back so much work over one stupid stitch, but I couldn't help it. I couldn't shake the fear that it would turn out to matter, and sure enough, it would have mattered. My entire thumb gusset was off by three rows, and wouldn't have fallen the way it was supposed to. It might not have been noticeable, but it might have made a difference in the look and fit, so I'm really glad I went back and found the error.

But now...it's past time for bed.

Tuesday, December 30, 2008

Disaster

My Christmas knitting deadline is tomorrow and I was determined to have the orchid mitts at least finished. They're small, they're relatively quick, that's totally doable, right?

No. Last night I got to the point where I was supposed to put the thumb stitches on the holder, only I had gone two rounds too far. Tonight, I picked back the two rounds and put the stitches on the holder, increased as directed and continued on...and found I was one stitch short. I backed up...still one stitch short. I put the thumb stitches back on the needles. Still one stitch short.

I am dead certain that I was counting those stitches at least every other round, if not more often. I cannot imagine where I lost that stitch. I can't find anywhere that a stitch was lost. I can't find any random extra decrease that I may have made. As far as I can tell the issue is not in the thumb stitches. I can't find it anywhere. I know that I could just increase an extra stitch and proceed, but frankly I'm afraid to do that without knowing where I went wrong. If there is a dropped stitch somewhere it will have to run eventually and that will be a problem. Still - I can't find one.

I put it down and decided to get out the other mitt and do the rest of the thumb. And...here's the really horrible part.

I can't find the almost-finished mitt. The SO and I have turned the house upside down (and discovered an extremely upsetting mouse nest in the process) without success. I called my mom to see if I maybe dropped it in their guest room. No luck. I'm terrified that I left it at the plane, and I'm certain that I had it here. Unfortunately, I have a very vivid imagination and I remember all sorts of things that never happened. I am sure I didn't take it out at the airport or on the plane, but again, "sure" for me is a relative term. And, even if I'm sure I didn't take it out on purpose, that does not rule out having dropped it out of the bag on accident.

I am extremely upset, not just because I don't have a present for my friend tomorrow, not even one completed mitt, but because this means that I will not be free of the Christmas knitting for even longer. The two things that I planned to knit for Christmas and I haven't finished either one of them and I am going to be knitting them FOREVER as punishment.

I know many people do not knit for Christmas do to this very feeling, but I really thought what I had on my list was doable (and it was, until work exploded, I got sick, and I added 3 other projects to my list).

I'm just so, so disappointed.

Monday, December 29, 2008

When the Christmas Knitting is over

I'm back at home, yay. More on that some other post. I need a moment of self-indulgence. I finished the mitts for my brother ("Just what I always wanted. A fabric tube"), the hat for my dad ("I thought you could wear it when you went hunting." "We usually try not to wear things the same color as the deer.") and the scarf for my mom was declared done somewhere around midnight or 1 a.m. Christmas Eve/morning, when it reached 3 feet and I couldn't keep my eyes open any longer ("Oh, it's cute!").

I still have to finish the Orchid Mitts and Whispering Pines. I worked on the second mitt on the plane and finished the cuff, so I'm working on the hand now. It's going fairly quickly and I am confident I will be able to finish it before Wednesday, which is my deadline.

I've finished the body of Whispering Pines and I'm all set now to work on the edging. However, it's kind of a lot to get done by Wednesday and I am working this week. Therefore...I may need an extension on that one. Dangit.

However, it is JUST BARELY possible that I might be able to finish it and I am going to knit like the wind until there is NO HOPE LEFT. But, the mitts are the priority because I see that recipient more often. Also, I am confident I can finish those. It's possible that if I worked on WP I might not manage to finish either and then I would really feel lousy. SO. A ways yet to go, but I am dreaming of new projects.

Therefore, I present to you, a list of what I plan to knit when the Christmas Knitting is done:

--Swirled Pentagon Pullover, a.k.a. My First Sweater (Valley Yarns Colrane)
--Hemlock Ring Blanket (Valley Yarns Northampton)
--Swan Lake (Jaggerspun Zephyr, ebony with hematite beads)
--Hamsa Scarf (Homestead yarn)

Things I'd like to get back to:
--Moonlight Sonata (Rowan KSH)
--MS4? Maybe? Eh. Not sure about this one...I've got a lot of stuff I would rather work on.

I have lost the coffee pot rock socks. I can't figure out what I did with them. I may have dropped them at church or something, or stuck them in a bag - as long as I didn't drop them in the road somewhere they should make their way back to me eventually. I'm well known to be the knitter. In the meantime I have started a pair of socks using the Blue Ridge Yarns that I got at Nature's Yarns a while back. So far, I have received no yarn for Christmas, so I may have a little sock yarn binge in January, because I'm definitely running low.

Monday, November 24, 2008

Weekend Report

The coffee pot rock sock is flying.

IMG_4062-1

I've got maybe a couple of inches left before the toe.

IMG_4060-1

But, the Christmas knitting was not entirely neglected! I have almost finished one (1) orchid mitt:

IMG_4064

It just needs a thumb.

IMG_4066

I'm wondering, a little bit, if I did something wrong, missed an instruction somewhere. If you look at the picture of the back, it seems like the whole pattern would look much better if the triangle in the top lace pattern centered over the orchid pattern beneath it, so the whole thing comes up to a point, which right now, it does not do. Looking closely at the picture on the pattern (which is not easy, it is kind of small and the yarn is variagated), it looks like it IS centered over that orchid piece so...I'm not sure what I did. Maybe I missed an instruction? Ravelry is down for maintenance so I can't look at other projects to see. It's really bugging me, but the recipient probably won't notice...should I go back and rip it out and redo it, or let it go and do it the same on the next one?

I also worked on the scarf for my mom when we went to the football game last night, but I will not bore you with a picture since it looks exactly the same, only longer (about 10" now).

I have to decide what to do for Thanksgiving knitting. I guess I will probably take both the coffee pot socks and the scarf for mom and see which one I can handle working on. The scarf is not hard, per se, but I have found that it does in fact require some attention, even with the pattern memorized. I found myself wishing I had something from Wrapped in Comfort on the needles, becuase the stitch manipulations aren't very difficult on those and the bigfoot shawl I worked a while ago was perfect for take-around knitting. I do actually have several skeins of Jojoland in various purply shades sitting at home for just such a project, but alas, such a project would be for me and all my personal knitting is on hold until the Christmas knitting is finished (except for the socks).

I took Tretta to church on Sunday, but I was too late. The lady I was making it for, the sister of my friend, passed away this past week. I was surprised at how heart-wrenching I found the news. I've never met the lady, never spoken to her, but I felt a horrible loss, not only because I felt bad for my friend who had to lose her sister, because my knitting had connected us and I felt like I was really losing somebody personally. My friend told me that while going through her sister's things, she found the original Odessa hat I knit back in April, and she is going to give it to another friend that has cancer, so that it will go on. I took Tretta to one of the ladies in my church who collects things for the hospital that she works in, and she is going to have one of her friends that works in the cancer ward find it a good home with someone who maybe doesn't have a lot of money to spend on things like that. I felt so full that I was ready to go home and buy a whole stash of yarn and beads to make more with. Maybe I have finally found the charity knitting project for me.

Thursday, November 20, 2008

Thinking Through...

...Is apparently against my personal philosophy.

I was in kind of a mood when I got home last night around 10 and I needed a fix, so I pulled out the yarn I bought to make the Orchid Lace Mitts that are to be a Christmas present for a friend and cast on. It...did not go well.

Issue #1: I disregarded the instructions on the tag that said that handwinding was recommended.

IMG_4030

This was probably dumb, and I acknowledged that to myself at the time...but ignored it anyway. I spent a great deal of time last night untangling the yarn I pulled from my center pull ball, since it refused to come smoothly.

Issue #2: This yarn is not particularly elastic. I knew that the silk would not be very bouncy, but apparently I did not adequately research the properties of cashmere. I'm a little concerned, since I do not think that cutting off circulation at the wrist is particularly conducive to warming hands.

Issue #3: I am a freaking idiot at 10 p.m. I have a general rule that I stop knitting at 9 unless it is utterly stupid, mindless knitting. Inevitably when I break this rule, I screw up. Therefore, casting on a new project after 10 was just ASKING for trouble. Sure enough, I managed to, within three rows, turn my work inside out AND start working with the tail end of the yarn instead of the part of the yarn that was actually connected to the ball. I didn't notice until I came to the end of the tail, and...it was kind of a long tail. I had to undo two rounds, but it turned out not to really matter because when I finally got back to working with the right piece, the yarn got really hung up coming out of the ball, and while I was trying to get it loose, it broke. All attempts to splice it back together failed miserably, and in the end I pulled the whole thing off the needles, flung it from me, and re-cast on (over two needles held together, because I was concerned about issue 2), because I am both stupid and unable to admit defeat. Had I waited, it might have occured to me that maybe I should cast on with the tail on the outside of the yarn cake, but it didn't, so I'm sure I will end up in the same situation once I have three or four inches of the thing knit.

All of this, I could get over, but I really am concerned that maybe I made the wrong choice of yarn. I really wanted something decadent, but I'm just not sure this is going to work out. Do I keep going and have a little faith becuase really, you can't tell anything from the first couple of rows anyway? I could ditch it and use the other skein of Gloss lace that I bought for my mom's scarf (on which no progress has been made, and I wasn't ever really sure I would need a second skein anyway, and even if I did, these mitts aren't supposed to take that much). I probably even have enough Lane Borgo-whatever Cashwool left over from Scheherazade, I could use that. Not sure it would wear well enough, though. Decisions, decisions.

On the upside, the coffee pot rock socks are cooperating nicely now. I think, though, that if I were doing it over I might go for a slightly tighter guage. But, they're on the smallest needles I own now as it is, and with the holidays coming up, buying more needles is not really on my to-do list. The socks ARE going very quickly since they are not patterned, but...but...then I will be out of simple knitting. I do have more sock yarn in the stash, but nothing I'm really terribly excited about. Some Cherry Tree Hill that I harbor some ill will toward due to the torture that was knitting the potpouri sachets I made for my friend back when I first learned to knit. I expect that they would not be nearly so torturous now, but they did drive me kind of crazy back then, and I have not forgiven the yarn for its treachery (even though it had nothing to do with the yarn and everything to do with the fact that this was supposed to be a really fast project but it turns out that, having been knitting for only a couple of months, I was kind of slow ass at it).

I do have some Twisted Sister sock yarn that I got at Yarn Market a while ago, but I wasn't as happy with the color as I expected to be, and I think it's hand wash, and I do not hand wash socks.

Oh! I know! I bought some Blue Ridge Yarns sock yarn at Nature's Yarns! So that will be the next set of socks after I zip through the coffee pot rock socks (watch me still be knitting coffee pot rock three months from now, now that I've said that).